Student Housing Project Completed at Cal Poly Pomona

POMONA, CA – Phase 1 of the first-year student housing replacement project at California State Polytechnic University, Pomona, was recently completed.

“This project was truly a team effort,” says Sundt Construction Vice President Robert Stokes. “Together with university staff, and our design-build partners, we were able to present Cal Poly with the transformative project they were looking for.”

Cal Poly Pomona Housing

Photo courtesy of Sundt Construction

The project consists of two eight-story towers that house 980 students and includes a 35,000-square-foot dining facility. Both towers are structural concrete constructed by Sundt’s own concrete crews. The project included the relocation of approximately 2,600 linear feet of Kellogg Drive, and the addition of 400 parking spaces around the area.

The mid-rise design includes shared social spaces, welcomes in natural light, and makes open-air connections throughout the entire eight floors of each of the two new buildings. Large windows allow insight to the social activities happening inside. Each floor has two 35-student households, which promote social engagement with living rooms, shared bathrooms that support gender equality and large communal stairway lounges. Bedrooms feature abundant natural light while hallways end in views toward the campus and local mountains. Shared social spaces create an intimate environment where students can interact and make life-long connections.

With the site being 16 acres, and the project itself being a little more than 10 acres, it was the largest project to date for the university.

The project was also the first collaborative design-build project for Cal Poly Pomona. Sundt Construction teamed up with HMC Architects and EYRC Architects to complete the $162-million project.

Featured

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Anderson Brulé Architects Rebrands as ABA Studios

    Anderson Brulé Architects, based in San Jose, Calif., recently announced that it is celebrating 40 years of service by rebranding under a new name, according to a news release. The architectural, interior design, and planning firm will now be known as ABA Studios to refresh its identity underneath a new generation of leadership.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Digital Edition