Grand Canyon U Students Help Build COVID-safe Outdoor Theatre

Faculty, staff and students at Grand Canyon University's College of Fine Arts and Production have constructed an outdoor theatre for use this play season, which addresses COVID-19 restrictions while still allowing students (and their audiences) to enjoy live productions. During the first production, The Comedy of Errors, students wore clear face masks.

The project, which took about a month, called on student workers and cast members to pitch in on construction of the stage, which is located on the lawn in front of the college's building.

The university reported that stage lighting will resemble that of a café. Photo by David Kadlubowski, GCU News Bureau

The 40-foot stage is surrounded by designated seating areas for audience members, allowing families to sit together while also remaining distanced from others. The lighting resembles an outdoor café. The set also has a booth for controlling stage lighting and sound. All plays will be livestreamed for people who prefer to watch from home. The first production is already available for viewing on GCU's YouTube channel.

"It's much different than one of our standard builds for a theatrical show because we don't normally have to build an entire theatre," said Technical Director Brad Cozby in a college article.

Cozby said he worked with the college's Dean, Claude Pensis, and Assistant Dean, William Symington, on the effort. "There were a lot of talks among the three of us on how we could make something like this happen," Cozby said. "I was given a list of objectives for what the stage needed to accommodate, and then I took that and worked through the engineering of it all."

"I think that artists and particularly performing arts folks are used to being adaptable," Symington added. "Creative problem-solving is literally what we do every day. When we're working on a project, it's never sort of a set situation where we're like, 'Oh we'll just do it the same way as we've always done it.' It never works that way."

Cozby said his favorite part of the initiative was working alongside students. "They've really thrown themselves into this project whole-heartedly," he noted. "It's just been an absolute joy to work with them and make all of this happen."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • Creating a First and Lasting Impression with Thoughtful, Sustainable Design

    Clemson University’s Nieri Family Alumni and Visitors Center serves as the new front door to campus, anchoring the Tiger experience through each step in the student journey.

Digital Edition