Clemson Adds Outdoor Lab Site for Construction Science Students

A South Carolina university has just set up a three-acre site to give their construction students a permanent space for hands-on learning. Students in Clemson University's Nieri Family Department of Construction Science and Management will be able to use the "Experiential Learning (XL) Yard" to construct full-scale structures and try out construction equipment. The new yard includes an 1,800-square-foot learning center.

Experiential Learning Yard. Image Credit: Clemson University Relations

All of the department's students — 250-plus — will take classes at the site, including a safety course and a construction science workshop.

"It's really our outdoor laboratory for construction," said Mike Jackson, chair of the department, in a university article.

The classroom and yard also will also host guest lectures by construction professionals. "They'll bring their expertise to the classroom," added Richard Gauthier, the department's experiential learning program coordinator. "Some will also bring equipment to work with in the yard."

The prompt for developing the space came from the students themselves, who told the university in surveys that they'd like more "hands-on experiences." Students in the program are required to complete 800 hours of internships prior to graduation.

Up to now those students have gained a lot of their practical experience by working on initiatives such as Habitat for Humanity, a nonprofit that builds homes for low-income people who put in sweat equity. Each fall, over the course of a month, students build a Habitat house in connection with homecoming. Those houses are transported to sites in the county, where the new homeowners occupy them.

While that "time-honored project" will continue, students will also be able to construct smaller structures — tiny houses and gazebos — for auctioning off to support future projects at the XL Yard.

The yard was made possible through multiple donations. The classroom was donated by Michael Nieri, a graduate and founder and president of home developer Great Southern Homes. In 2019 Nieri and his wife donated $5 million to the department, which now carries the family name.

"Our corporate partners have been very generous," said Jackson. "We are very blessed to have such a wonderful group of industry supporters at Clemson and in the Nieri Family Department of Construction Science and Management."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

Digital Edition