NY School Sees AV Equipment Overhaul

An upstate New York public school recently saw a major upgrade to its AV capabilities through a partnership with Ashly Audio and Advance Sound Company. Stissing Mountain Junior/Senior High School of the Pine Plains Central School District in Pine Plains, N.Y., updated its suite of audio amplification and control solutions to serve not just the school’s students and faculty, but the wider community. In the small town of about 2,500, the local junior/high school serves as an educational facility, a community meeting space, and a live performance venue.

“When you have a space that is truly the preeminent meeting and performance hall for a community, your primary concerns need to be that the system works well and is extremely intuitive to control,” said Thomas DePace of Advance Sound Company, which installed the equipment. “What we found in Ashly Audio was a system that confidently checks those boxes and brings with it a ton of flexibility.”

Advance Sound Company integrated the following products into the school space:

  • Ashly NE24.24M with a Protea DSP Audio Matrix Processor providing 12 inputs and 12 outputs
  • Ashly NE24.24M with a Protea DSP Audio Matrix Processor with four inputs and four outputs
  • Ashly NXE1.52 Network Power Amplifier providing two channels, each delivering 1,500 watts at 2 ohms
  • Ashly NXE8004 network amplifier delivering four channels, each providing 800 watts at 2 ohms
  • Ashly NE8800MM network-enabled Protea DSP with eight inputs, eight outputs, and 2 four-channel mic cards

“We’re using that full array of Ashly amplification to power multiple Danley speakers throughout the facility,” explained DePace. “Everything from larger speakers across the main auditorium to monitors and stage fills. The Ashly setup also has a very nice way in which it allows for mixing the system.”

DePace also commented that, for the system’s complexity, the setup remained intuitive and easy-to-use. “We were able to set it up so perfectly that I have no doubt that when the principal or the custodian need to use the system, it will be very easy for them to do so,” he said. “When your customer is a small or medium-sized organization, having that confidence is a huge benefit.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • USC Launches Major AI Initiative After $200M Gift

    The University of Southern California in Los Angeles, Calif., recently announced that it has launched a “transformational” new AI initiative thanks to a $200M gift, according to a news release. The project will leverage AI toward breakthroughs and innovations in subjects like the health sciences, business, security, and the arts.