NY School Sees AV Equipment Overhaul

An upstate New York public school recently saw a major upgrade to its AV capabilities through a partnership with Ashly Audio and Advance Sound Company. Stissing Mountain Junior/Senior High School of the Pine Plains Central School District in Pine Plains, N.Y., updated its suite of audio amplification and control solutions to serve not just the school’s students and faculty, but the wider community. In the small town of about 2,500, the local junior/high school serves as an educational facility, a community meeting space, and a live performance venue.

“When you have a space that is truly the preeminent meeting and performance hall for a community, your primary concerns need to be that the system works well and is extremely intuitive to control,” said Thomas DePace of Advance Sound Company, which installed the equipment. “What we found in Ashly Audio was a system that confidently checks those boxes and brings with it a ton of flexibility.”

Advance Sound Company integrated the following products into the school space:

  • Ashly NE24.24M with a Protea DSP Audio Matrix Processor providing 12 inputs and 12 outputs
  • Ashly NE24.24M with a Protea DSP Audio Matrix Processor with four inputs and four outputs
  • Ashly NXE1.52 Network Power Amplifier providing two channels, each delivering 1,500 watts at 2 ohms
  • Ashly NXE8004 network amplifier delivering four channels, each providing 800 watts at 2 ohms
  • Ashly NE8800MM network-enabled Protea DSP with eight inputs, eight outputs, and 2 four-channel mic cards

“We’re using that full array of Ashly amplification to power multiple Danley speakers throughout the facility,” explained DePace. “Everything from larger speakers across the main auditorium to monitors and stage fills. The Ashly setup also has a very nice way in which it allows for mixing the system.”

DePace also commented that, for the system’s complexity, the setup remained intuitive and easy-to-use. “We were able to set it up so perfectly that I have no doubt that when the principal or the custodian need to use the system, it will be very easy for them to do so,” he said. “When your customer is a small or medium-sized organization, having that confidence is a huge benefit.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Florida SouthWestern State College, Skanska Partner for Humanities Hall Renovation

    Florida SouthWestern State College (FSW) in Fort Myers, Fla., recently announced that it is partnering with construction firm Skanska to renovate the school’s Humanities Hall, according to a news release.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • Recent University of Pennsylvania Projects Receive LEED Certifications

    The University of Pennsylvania in Philadelphia, Penn., recently announced that three of its recent construction projects have earned LEED certifications, according to university news. The Vagelos Laboratory for Energy Science and Technology (VLEST) received a LEED Platinum certification, Amy Gutmann Hall a LEED Gold, and the OTT Center for Track and Field a LEED silver.

Digital Edition