NY School Sees AV Equipment Overhaul

An upstate New York public school recently saw a major upgrade to its AV capabilities through a partnership with Ashly Audio and Advance Sound Company. Stissing Mountain Junior/Senior High School of the Pine Plains Central School District in Pine Plains, N.Y., updated its suite of audio amplification and control solutions to serve not just the school’s students and faculty, but the wider community. In the small town of about 2,500, the local junior/high school serves as an educational facility, a community meeting space, and a live performance venue.

“When you have a space that is truly the preeminent meeting and performance hall for a community, your primary concerns need to be that the system works well and is extremely intuitive to control,” said Thomas DePace of Advance Sound Company, which installed the equipment. “What we found in Ashly Audio was a system that confidently checks those boxes and brings with it a ton of flexibility.”

Advance Sound Company integrated the following products into the school space:

  • Ashly NE24.24M with a Protea DSP Audio Matrix Processor providing 12 inputs and 12 outputs
  • Ashly NE24.24M with a Protea DSP Audio Matrix Processor with four inputs and four outputs
  • Ashly NXE1.52 Network Power Amplifier providing two channels, each delivering 1,500 watts at 2 ohms
  • Ashly NXE8004 network amplifier delivering four channels, each providing 800 watts at 2 ohms
  • Ashly NE8800MM network-enabled Protea DSP with eight inputs, eight outputs, and 2 four-channel mic cards

“We’re using that full array of Ashly amplification to power multiple Danley speakers throughout the facility,” explained DePace. “Everything from larger speakers across the main auditorium to monitors and stage fills. The Ashly setup also has a very nice way in which it allows for mixing the system.”

DePace also commented that, for the system’s complexity, the setup remained intuitive and easy-to-use. “We were able to set it up so perfectly that I have no doubt that when the principal or the custodian need to use the system, it will be very easy for them to do so,” he said. “When your customer is a small or medium-sized organization, having that confidence is a huge benefit.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition