N.C. College Resumes Construction on New Academic Building

North Carolina's Meredith College will soon resume work on a new facility to house the institution's communication and exercise and sports science programs. Construction plans had been paused in 2020 when the pandemic struck. The building will be located on the northwestern side of the school's 225-acre campus.

The 13,000-square-foot structure will include a number of common areas as well as dedicated spaces, including an "agency-style" classroom, a media studio and editing rooms, a human performance lab, an assessment lab and conference room.

Meredith College construction
Photo credit: Meredith College

Both academic programs have grown significantly in the past decade. According to the college, enrollment in Meredith's undergraduate communication program has grown by 29% and the exercise and sports science program by 52% since 2011.

Design is being handled by Design Development Architects, also Raleigh-based. The general contractor for the project is Inland Construction, with headquarters in Garner, N.C.

Work on the new building is expected to be done during the next academic year. A virtual tour is available on YouTube.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition