Ore. District Breaks Ground on Two New Elementary Schools

The Hermiston School District, located in Hermiston, Ore., celebrated the groundbreaking of two new elementary schools last week. One replacement facility and one new facility are both set to open in the Eastern Oregon district in 2022.

The replacement facility is a new home for Rocky Heights Elementary. It will have a capacity of 600 students and measure in at 73,500 square feet. The $23-million building will be one story and contain 24 classrooms, a library, a gym, and other student common areas. The building will be constructed at the former site of the current school’s athletic fields. Students will continue attending school in the existing building for the 2021-22 academic year until the new school opens in fall 2022. The existing Rocky Heights Elementary was built in 1962 and faces a multitude of maintenance and security issues, according to the East Oregonian.

The other construction is for a new elementary school to be known as Loma Vista Elementary School. Loma Vista will also have capacity for 600 students and have a layout very similar to the new Rocky Heights Elementary. The school is scheduled to open in time for the 2022-23 academic year.

Funds for the construction of both buildings come from an $87.2 million bond that passed in 2019. The bond will also fund a new softball complex for the district, a new classroom annex at Hermiston High School, the purchase of additional property for future construction projects, and upgrades to parking areas at several schools in the district. The district is partnering with BBT Architects for design and Kirby Nagelhout Construction Co. for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Anderson Brulé Architects Rebrands as ABA Studios

    Anderson Brulé Architects, based in San Jose, Calif., recently announced that it is celebrating 40 years of service by rebranding under a new name, according to a news release. The architectural, interior design, and planning firm will now be known as ABA Studios to refresh its identity underneath a new generation of leadership.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Digital Edition