Harvard Sees Completion of New Science Complex

Harvard University recently saw construction finish on its new Science and Engineering Complex (SEC), located across the Charles River from its main campus in Cambridge, Mass. The complex, designed by Behnisch Architekten, is set to open to students in fall 2021. The eight-story structure covers more than 540,000 square feet and features classrooms, laboratories, collaboration spaces, and more designed to foster interdisciplinary study.

The newest addition to the Allston campus offers street-level makerspaces and teaching labs visible to passersby, increasing engagement with the local community. The lower floors offer classrooms, teaching labs, and amenity spaces—some of which function as fixed-seating classrooms, while others are active-learning spaces designed to allow a wider variety of layouts and activities. The facility will serve as the home to a large part of Harvard’s John A. Paulson School of Engineering and Applied Science (SEAS) and welcome researchers and students in fields including robotics, computer science, electrical and mechanical engineering, bioengineering, materials science, and more.

The facility’s upper floors will feature almost 70,000 square feet of wet research lab space for biology, chemistry, physics, optics, and electronics classes and research, as well as about 24,000 square feet of dry research labs for computer science. Flexible lab environments leave room to repurpose various spaces later on as needs change.

The team from Behnisch Architekten, tasked with making the SEC the “healthiest building on the Harvard campus,” created a design that garnered LEED Platinum and Living Building Challenge Petal certifications in Materials, Beauty, and Equity. Materials used are free of a specific set of harmful chemicals, comply with the LBC Red List, and conform to the standards of Harvard’s Healthier Building Academy.

The building contains the world’s first hydroformed tensile façade system, reducing solar heat from glazed daylighting openings and using high-comfort radiant systems for indoor climate control. Its water-based heating and cooling systems use one-third of the energy of air-driven systems. The two fast, daylit atria and interior partitions reflect daylight deep into the building’s interior. It also features five acres of roof terraces with vegetation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

Digital Edition