Spalding University to Renovate Former Car Dealership

Spalding University in Louisville, Ky., recently announced that it will undertake $7 million in renovations to a former V.V. Cooke Chevrolet dealership to create a home for its new Doctor of Physical Therapy (DPT) program. Construction is scheduled to be complete in late 2021, and the renovations mark one of the largest capital projects in the university’s history.

The university acquired the 21,500-square-foot facility, located on Third Street in the downtown area. “The transformed building on Third Street will be a beautiful addition to the south end of campus, a tremendous resource to our students and the latest example of our unwavering commitment to a thriving downtown Louisville,” said Spalding University President Tori Murden McClure. The renovations will expand the university’s health science presence along that street, joining the Republic Bank Academic Center and the Kosair Charities College of Health and Natural Sciences.

Spalding University Doctor of Physical Therapy program

Once renovations are complete, the two-story building will include three skills labs for in-person instruction, an anatomy education center, and an anatomy wet lab with an accompanying dry lab featuring models and technology for instruction. A naturally lit atrium will provide lounging and collaboration space for students. The project’s general contractor is Schaefer Construction, and the architecture partner is Schmidt Associates.

“This learning space will foster interdisciplinary and interprofessional collaboration among students and faculty across our health science and health professions programs and will be a site of innovation and inspiration,” said Spalding Dean of Graduate Education Dr. Kurt Jefferson. “Consistent with the Spalding mission, we will instill in our students a commitment to diversity, justice and equity and the need to care for underserved populations.”

The new, entry-level Doctor of Physical Therapy program will follow a hybrid, low-residency model of online lectures and in-person laboratory sessions to be held one week per month. In addition to entry-level students, it will also provide a means for practicing PTs to further their education and earn a doctorate.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition