SRG Partnership Designs Net Zero Energy Building for OSU Cascades Campus

Architecture firm SRG Partnership recently announced that it has designed a Net Zero energy building for the Cascades Campus of Oregon State University in Bend, Ore. Edward J. Ray Hall will serve as a Science, Technology, Engineering, Arts and Math (STEAM) learning center featuring both interior and exterior active learning spaces. The facility has a Net Zero energy target and a structure made of regionally sourced mass timber.

The 50,000-square-foot, four-story building will be the first to take advantage of a 46-acre site that the university acquired for campus expansion. The site contains a reclaimed pumice mine, and a press release notes that Edward J. Ray Hall will stand at the top of the mine’s steep eastern rim, serving as a gateway between the existing campus and future developments in and around the former mine’s bowl.

Edward J Ray Hall at Oregon State University Cascades Campus

The use of mass timber ties into the university’s commitment to sustainability, using locally sourced renewable materials and leaving a low carbon footprint. The building’s east-west orientation, along with large windows and vertical shading devices, allows it to take advantage of the sun’s position to maximize daylight while reducing glare and summer heat. The roof will feature an array of photovoltaics as a source of on-site renewable solar energy for the building.

The design and prototype process focused on accommodating as wide a variety of education activities as possible to encourage interdisciplinary collaboration, social equity, and sustainability. Edward J. Ray Hall serves as a scalable, adaptable proof of concept that will serve as a template for future buildings while leaving plenty of room for adaptation unique to these future buildings’ purpose, location, and conditions.

The total cost of the new facility is estimated at $49 million, and it is scheduled to open in fall 2021. Various donors contributed a total of $10 million to match funds provided by the state.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition