BGSU Breaks Ground on School of the Built Environment Facility

Bowling Green State University in Bowling Green, Ohio, held a groundbreaking ceremony last week for a new School of the Built Environment facility. Once complete, the building will play home to the construction management and architecture and environmental design programs. The project comes with a $10.4-million price tag and is scheduled for completion during the 2022-23 academic year.

The work includes a 22,900-square-foot expansion of an existing academic building on Park Avenue, which currently houses the architecture and environmental design program, and the new construction of an adjacent building. The new space will feature a 6,500-square-foot innovation lab for fabrication and construction classes, two digital labs, a materials and soils lab, classrooms and collaboration spaces.

“Having both programs under one location allows students in architecture and environmental design and construction management to learn from each other, which better prepares them for working on multidisciplinary teams,” said Dr. Joe B. Whitehead Jr., BGSU provost and senior vice president for Academic and Student Affairs. “It also allows our faculty to engage in collaborative research that will provide a deeper understanding of both fields, enhancing collaborative opportunities and driving student success.”

The School of the Built Environment is the only one of its kind in the state. BGSU also offers one of two Construction Management programs in Ohio and about 60 nationwide accredited by the American Council for Construction Education. The Park Avenue building had been previously renovated in 2014 to feature amenities like studios, a materials and reference library, a print room with plotters and laser cutters and an administrative suite for the architecture and environmental design program.

“As a public university for the public good, BGSU recognizes the importance of educating construction management students who understand design and architecture students who understand construction,” said BGSU President Rodney K. Rogers. “This innovative facility will increase collaboration in the School of the Built Environment, and it will better serve students, who will be prepared for productive careers and meet the workforce needs in Ohio and beyond.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition