Construction Begins on UF Public Safety Building

On the campus of the University of Florida in Gainesville, Fla., construction has already begun on the new University of Florida Public Safety Building. The new home of the UF Police Department is intended to enhance visibility on campus and promote accessibility to the public. The facility was designed by SchenkelShultz Architecture.

“We are very proud of this project,” said Ekta Desai, a Partner at SchenkelShultz. “In working with UF and testing options within our studio, we were able to create a practical, inviting, high-performance space that will accommodate multiple Public Safety departments. By design, the new building will define a campus landmark as a gateway and enhance communication and reaction time to better serve the University of Florida community.”

University of Florida Public Safety Building

The new, three-story facility will unite several different business units that are currently scattered around campus. It will house administration offices, a public lobby space, offices, a community meeting room, multi-purpose space, a secure storage area for public records, interview rooms, locker rooms, and a vehicle sally port for the secure transfer of individuals in custody.

“With the firm’s growing Public Safety design talent and community-driven focus, we have been able to leverage our expertise to create a space that will increase efficiencies and impact,” said Johnnie Lohrum Jr., Principal and Public Safety Market Leader at SchenkelShultz. “It is important for our firm to focus on projects that will impact our community in a positive way.

The facility will measure in at 50,000 square feet. The university is partnering with Ajax Building Company for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.