Chicago Private School Breaks Ground on $25.7M Performing Arts Center

Loyola Academy, a private Jesuit college preparatory school in Wilmette, Ill., recently broke ground on a brand-new, 29,000-square-foot performing arts center. The Loyola Academy Center for the Performing Arts comes with a $25.76-million price tag and will feature flexible indoor and outdoor performance spaces. The project was designed by Chicago-based Krueck Sexton Partners (KSP).

“In our conversations with Loyola leadership, it became clear that we are working with a client who is seeking transformational change, the DNA of the Jesuit experience,” said Tom Jacobs, AIA, LEED AP, co-managing partner at KSP. “It was critical for Loyola to strengthen the fine arts on campus, and to elevate it to equal standing with academics and sports. The theater acts as a connector that extends cross-campus circulation, and the new quad will function as a campus ‘town square.’”

The facility will feature amenities like a 125-foot, curved glass wall to blend the indoor and outdoor spaces; a 565-seat proscenium theater with a balcony, fly tower, orchestra pit, and lighting technology; a rehearsal and staging area; a scene shop; a green room, makeup room, and dressing rooms; and a student lounge area.

Loyola Academy Center for the Performing Arts
Photo courtesy of Krueck Sexton Partners (KSP)

Students in the school’s American Institute of Architects (AIA) student chapter played a fundamental role in the planning and design process. Community stakeholders, parents, and donors were also given the chance to engage and give feedback. The all-electric building was designed with sustainability goals in mind, aligning with the Chicago area’s transition to all-renewable fuel sources by 2035. The facility will leave room for the anticipated installation of a rooftop photovoltaic array capable of powering the entire building.

“True leadership in education considers the wellbeing of all, far into the future,” said Sara Lundgren, AIA, LEED AP, project director and partner at KSP. “As a high-performing building that uses 58 percent less energy when compared against the local average of peer institutions, the theater is a testament to the ‘be more’ ethos that pervades Loyola Academy. It is a building that future Ramblers will look to and recognize that they are part of a group of people who literally practice what they preach.”

Construction is scheduled for completion in 2022. The project’s general contractor is Valenti Builders. Other project partners include Coen Partners (landscape architects), A10 (sustainability consultant), Schuler Shook (theater designer and lighting design), and ESD (mechanical / electrical / plumbing engineer).

“Since the first Jesuit school opened nearly five centuries ago, we have understood that the arts play an important role in the enrichment of the human spirit and the development of creative thinkers with the potential to transform society in positive ways,” said Rev. Patrick E. McGrath, SJ, president of Loyola Academy. “Our new performing arts center represents a long-anticipated expansion of resources and facilities that will benefit all Loyola students and expand access to a broader network of our community partners, neighbors and friends.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.