Alma Announces Student Information System Upgrades

Alma Student Information System (SIS) recently unveiled updates to its SIS platform, providing new features making it easier for districts to onboard schools and use third-party apps. Both the parent and student versions of its portals are also now available in Spanish. The updates were released in time for the new school year.

“Alma’s upgrades make the onboarding and overall day-to-day SIS experience for schools and districts even better, and also support our mission of increasing educational equity, inclusion and family engagement,” said Andrew Herman, Alma’s founder and CEO, in a news release. “If schools and districts learned anything in 2020, it’s that technology demands on educators and parents are greater than ever. We are creating tools such as the App Center to make it easier for educators to use the apps they love while using their student information system. And we are improving access to student information for Spanish-speaking families, making Alma a comprehensive SIS solution for schools.”

Upgrades to Alma include:

  • Navigator, which helps school districts transition over to Alma. The in-app SIS implementation guide reduces migration and setup time by providing point-by-point onboarding instructions, project management tools, and progress updates. Schools can configure project plans to assign tasks (like setting up GPA scales or class schedules) to team members around the school, and users with permission can track the status of all assigned tasks.
  • The app center, which enables districts to integrate third-party apps into the SIS. Administrators can select their app of choice from Alma’s Vendor Library and select the appropriate files and data to share. They can also add apps to the Vendor Library and use the Integrations Dashboard to view the setup and metrics of its daily use.
  • Multilingual parent and student portals offer access and engagement to non-English-speaking families. Spanish versions of the portals are already available, with other language options coming soon. Students and families can access the system in English or Spanish for tasks like registering their children and viewing grades form a mobile device.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Tennessee State University Gains Approval for New Engineering Facility

    Tennessee State University in Nashville, Tenn., recently announced that it has received approval from the Tennessee State Building Commission to build a new engineering building on campus, according to a university news release. The 70,000-square-foot, $50-million facility will play home to the university’s engineering programs and the Applied & Industrial Technology program.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

Digital Edition