Austin Area Debuts New Elementary School

The Luling Independent School District in Luling, Texas—part of the Austin metropolitan area—recently celebrated a ribbon-cutting ceremony for its newest facility. Shanklin Elementary School came as a result of a bond program passed by voters in May 2019 to upgrade and replace five district facilities in poor condition. The two-story facility cost $23.6 million and measures in at 86,000 square feet.

“The new Shanklin Elementary continues the tradition of excellence so many generations of Luling ISD students have experienced,” said Erin Warren, Luling ISD Superintendent. “The district is excited to welcome our community to see firsthand the extraordinary instructional opportunities in place for future generations of students.”

Shanklin Elementary School
Photo courtesy of Lockwood, Andrews & Newnam, Inc. (LAN)

The new facility will replace two existing schools, Luling Primary and Leonard Shanklin Elementary Schools, and consolidate their students, faculty and staff into a single campus. The move will allow the district to divert maintenance and operations funds for Luling Primary School to other purposes.

Amenities in the new school include 42 new classrooms, two playgrounds, a gymnasium, a media center, a cafeteria and kitchen, and an administrative suite, according to a news release. It has also integrated a variety of life-safety and security enhancement measures to keep students safe.

“The new elementary school will meet Luling ISD’s needs for the next 50 years and provide students the infrastructure needed to succeed in the 21st century,” said JP Grom, AIA, vice president of Lockwood, Andrews & Newnam, Inc. (LAN), which managed the bond program. “In addition to providing a safe environment for students, the facility will also be used by the community for various purposes.”

The school district partnered with Claycomb Associates, Architects for design and Weaver & Jacobs Constructors, Inc. for construction.

The Luling 2019 bond program totaled $31.9 million, and it also included renovations at Gilbert Gerdes Junior High School and converting an existing elementary school into a staff and visitor parking lot.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition