Cambrian College to Save $480K in Energy-Related Upgrades

Ontario-based Cambrian College is moving into the next phase of a long-term agreement with Honeywell and Honeywell Building Technologies to replace aging equipment and update lighting in pursuit of energy savings. The improvements are expected to save the college at least $480,000 within the first year. Those savings, guaranteed by Honeywell, will be plowed into funding some of the upgrades.

Honeywell Cambrian College Energy Agreement

Honeywell staff install a geothermal heating and cooling system at Cambrian College as part of the college's energy efficiency and sustainability initiatives.
Source: Honeywell

The work, focused on support of energy conservation measures and creating more comfortable learning spaces, will include:

  • Implementation of a geothermal heating solution, to deliver supplemental heating and cooling and intended to help offset boiler consumption in the building housing Cambrian’s Sustainable Energy Centre of Excellence;
  • Upgraded smart LED lighting and fixtures, which will help the college understand how its physical areas are being used;
  • Installation of a high-efficiency chiller, to replace a legacy chiller; and
  • Deployment of a building management system, which enhances the campus' existing Honeywell Enterprise Buildings Integrator building automation system.

"A leading mission of Cambrian College is our commitment to reduce our carbon impact," said Kristine Morrissey, vice president of Cambrian's divisions of International, Finance and Administration, in a statement. "This project will allow us to do just that. We anticipate the project will reduce approximately 300 tons of greenhouse gasses a year, which is the equivalent of removing close to 100 medium-size cars from the road every year. In addition, the project is supporting the modernization of our campus in both its digital and physical space, which ultimately will provide our students and faculty an improved education environment."

The college began collaborating with Honeywell in 2013. Under that agreement, Honeywell committed to working with Cambrian, to review its facility and energy needs regularly and identify areas where the college could reduce operating expenses and greenhouse gas emissions. In turn, Cambrian agreed to provide training for Honeywell’s building technicians in Canada, along with other professional development services.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition