Cambrian College to Save $480K in Energy-Related Upgrades

Ontario-based Cambrian College is moving into the next phase of a long-term agreement with Honeywell and Honeywell Building Technologies to replace aging equipment and update lighting in pursuit of energy savings. The improvements are expected to save the college at least $480,000 within the first year. Those savings, guaranteed by Honeywell, will be plowed into funding some of the upgrades.

Honeywell Cambrian College Energy Agreement

Honeywell staff install a geothermal heating and cooling system at Cambrian College as part of the college's energy efficiency and sustainability initiatives.
Source: Honeywell

The work, focused on support of energy conservation measures and creating more comfortable learning spaces, will include:

  • Implementation of a geothermal heating solution, to deliver supplemental heating and cooling and intended to help offset boiler consumption in the building housing Cambrian’s Sustainable Energy Centre of Excellence;
  • Upgraded smart LED lighting and fixtures, which will help the college understand how its physical areas are being used;
  • Installation of a high-efficiency chiller, to replace a legacy chiller; and
  • Deployment of a building management system, which enhances the campus' existing Honeywell Enterprise Buildings Integrator building automation system.

"A leading mission of Cambrian College is our commitment to reduce our carbon impact," said Kristine Morrissey, vice president of Cambrian's divisions of International, Finance and Administration, in a statement. "This project will allow us to do just that. We anticipate the project will reduce approximately 300 tons of greenhouse gasses a year, which is the equivalent of removing close to 100 medium-size cars from the road every year. In addition, the project is supporting the modernization of our campus in both its digital and physical space, which ultimately will provide our students and faculty an improved education environment."

The college began collaborating with Honeywell in 2013. Under that agreement, Honeywell committed to working with Cambrian, to review its facility and energy needs regularly and identify areas where the college could reduce operating expenses and greenhouse gas emissions. In turn, Cambrian agreed to provide training for Honeywell’s building technicians in Canada, along with other professional development services.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.