U Alabama Trying Out Solar-Powered Pods

Shortly, the campus of the University of Alabama will sport a set of small, greenhouse-like structures where students can have private, socially-distanced space for their studies or relaxation. The university is working with SolarFi, a start-up that produces the pods. The Privé, as it's called, is equipped with solar panels, electrical charging points, HEPA air filters, ventilation and cooling systems.

The units can accommodate anywhere from one to 15 people, according to the company. They're constructed from a "highly resistant, fully transparent and safe polycarbonate structure," made from recycled materials and provide UV ray protection.

"I'm looking forward to spending time in the Privé pod. I always sit near the window while studying," said freshman Austin Rilling, an engineering student, in a press release. "To see SolarFi's pods on campus is like Christmas coming early. I get to study, relax in a bean bag and charge up all my devices using solar power in the pods."

"With solar energy and the Internet, we will empower students to study in nature without losing power," added SolarFi Creative Director Antonio Dixon.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.

  • New Jersey Day School Opens New Science & Entrepreneurship Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently celebrated the grand opening of the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIG Architecture on the 32,000 square foot facility, completed on a 17-month construction timeline in time for the beginning of the new school year.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.