Texas Debuts New Elementary School

The Lamar Consolidated Independent School District (Lamar CISD) in Fort Bend County, Texas, about 40 miles west of Houston, celebrated the start of 2022 with the opening of a new elementary school. Fletcher Morgan Jr. Elementary School finished construction in December 2021 and now plays home to about 750 students in grades PreK–5.

According to a news release, Morgan Elementary is the district’s 29th elementary school and the fourth to be designed by VLK Architects. VLK held meetings with school leaders to design a space that would increase engagement among the curriculum, students, teachers and parents.

“VLK Architects has done a phenomenal job designing our new campus, Morgan Elementary,” said Dr. Roosevelt Nivens, Lamar CISD Superintendent. “It truly is a beautiful campus equipped with everything that our scholars need to have an exciting and impactful learning environment. We are grateful for this new addition to our Lamar CISD community.”

The new facility was proposed as part of the 2017 bond election. It features learning areas organized into pods containing 6–8 classrooms, restrooms, storage space, collaboration space and outdoor areas. The design also includes modular furniture, media stations and activity walls to ensure a dynamic, active learning environment. Collaborative spaces like music and art rooms are located next to the gym and cafeteria to reduce ambient noise throughout the building. The full facility covers about 48,400 square feet.

“It’s an honor to be able to work with Lamar CISD in opening another elementary school that serves the students, faculty, and staff in this fast-growing community,” said Todd J. Lien, AIA, Managing Partner of VLK Architects.

The total cost of the project came in at $24 million, funded as part of the bond. The district partnered with VLK Architects for design and Drymalla Construction as the general contractor.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

Digital Edition