Massachusetts District Begins Work on $66.7M Middle School

Braintree Public Schools in Braintree, Mass., recently announced that construction has begun on a new school facility for the district. The structure will serve as a new home for the existing South Middle School, and it will also be the town’s first new school construction in more than 50 years. The new school measures in at about 146,000 square feet. It’s estimated to cost about $66.7 million and is scheduled for completion in time for the start of the 2023–24 academic year.

Local news reports that the COVID-19 pandemic had delayed plans to vote on a temporary tax increase to help pay for the project. After a special election in fall 2020, Braintree voters approved a $63-million debt exclusion, and the state is expected to pay about $31 million.

"This is a very exciting time for Braintree," said Mayor Charles Kokoros. "It has been a very long road, and I couldn't be happier to be a part of such a momentous occasion."

The new facility for South Middle School will consist of three parts, according to local news reports. The first part will include a dining room and auditorium, media commons, two innovation labs and a band room. The second part will include two two-story sections containing classroom organized by grade. The third part will be the athletic wing and feature two gymnasiums, one including bleachers and one without. The school’s design also includes an outdoor courtyard with three seating areas.

The school will serve about 800 students in grades 5–8. Braintree Public Schools is partnering with MDS Architects on design and Bacon Construction as the construction manager.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

Digital Edition