Florida High School Renovates Performing Arts Center

Construction recently began on a series of renovations and expansions to the Visual Performing Arts (VPA) Center at Booker High School in Sarasota, Fla. The school partnered with SchenkelShultz Architecture to enhance both the aesthetic and technical qualities of the space. The project is scheduled for completion by the end of 2022, according to a news release.

Booker High School Visual Performing Arts Center rendering

“The theater at Booker High School is rich in history and is one of the premier art and cultural ‘gems’ of the Sarasota community,” said SchenkelShultz partner Ken Dean. Renovations include expanding the public lobby for use as a pre-show gathering area and student art gallery; a new balcony and tiered orchestra level for the theater; enhancements to comfort, sightline, and acoustics from the audience; and an expansion that makes room for a black box theater, costume shop, green room and academic space.

“The design preserves the existing theater as a historically significant place to educate students and provides an artistic destination for performers, students, and the community,” said Ekta Desai, AIA, Partner and Design Lead at SchenkelShultz. “Simultaneously, we have elevated the space's production, technology, acoustics, and function, creating an environment that reflects the school's longstanding reputation for excellence.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Countway Library at Harvard Medical School

    From Shadows to Sanctuary: The Transformation of Light at Countway Library

    The renovation of Countway Library at Harvard Medical School demonstrates how biophilic design and advanced lighting strategies transformed a formerly dark, insular space into a vibrant, welcoming hub that supports wellness, learning, and community engagement.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.