Northern Arizona University Opens New Athletic Center

Officials from Northern Arizona University in Flagstaff, Ariz., recently gathered to celebrate the grand opening of a new athletic facility. The Student-Athlete High Performance Center measures in at 72,000 square feet and cost about $46 million. A news release notes that it is the university’s first athletics facility to be partially funded via alumni and former student-athlete donations.

The center provides vastly expanded space for student-athletes’ academic, weight training, recovery and nutrition needs. The facility’s Grand Hall also features memorabilia from past athletic success. Visitors enter the Grand Hall across a 140-foot walking bridge that elevates them to canopy level of the surrounding forest.

Northern Arizona University Student-Athlete High Performance Center

“Our design embodies the NAU Lumberjack brand and reinforces NAU’s culture as an institution and a championship-caliber athletics program,” said Andrew Kelly, DLR Group Sports Design Leader. “The iconic Parsons Family Auditorium undeniably features one of the best views of any training facility in the country, sitting above the tree line with a 60’ x 40’ glass wall that frames unobstructed views of the 12,600 ft Humphreys Peak and the San Francisco Range.”

The center features amenities like the nation’s largest high-altitude training chamber on a university campus, which simulates a variety of atmospheric conditions. The Scott and Franci Free Academic Center provides about 7,000 square feet of individual study space, three classrooms, staff offices and a computer lab. The Jennifer Marie Wilson Strength and Conditioning Center gives student-athletes a total of 11,500 square feet of weight training space. The Michael E. Nesbitt Athletic Training Center, meanwhile, offers three hydrotherapy recovery pools.

The university partnered with DLR Group for the facility’s design and with CORE Construction for the construction phase.

“CORE truly enjoyed the opportunity to partner with DLR Group in constructing this state-of-the-art facility for NAU Athletics, which will draw and serve student athletes who are national leaders in collegiate competition,” said Emerson Ward, CORE’s Director of Higher Education. “In the execution of the High-Performance Center project, our team was inspired by the energy that NAU Athletics and the student athletes bring to the ‘field’ every day, and we are excited to see this new facility help the Lumberjacks excel to new heights.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part I

    We asked, you answered, and the results are in! Last year, we put out a call for submissions to collect our readership’s opinion on trends and predictions for K–12 and higher education facilities in 2026.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

Digital Edition