Luxxbox Upgrades Linea Slimline Acoustic LED System

Luxxbox, which provides acoustic and flexible workspace solutions, recently announced significant upgrades to its slimline acoustic LED system. The Linea lighting fixture features noise absorption capabilities and acoustic performance. The new model features a plug-and-play power connector that allows canopies and power to be installed before the fixture, requiring only one power feed per run of lights, according to a news release. It also features a cassette-style drive to accommodate factory-programmable drivers after installation.

“The improvements made to the Linea installation process is an industry gamechanger,” said Jason Bird, Founder and Creative Director of Luxxbox. “Unique from other acoustic lighting fixtures on the market, the process is completely simplified with only one power feed needed per run.”

Linea Slimline Acoustic LED System
Photo courtesy of Luxxbox

The Linea fixture debuted in April 2019 and is intended to maximize noise cancellation and acoustic surface areas. The dimmable LED fixtures come as a direct or indirect wash and features shielding options like direct louvered, direct diffused, indirect lensed and unlit. It also comes in four height options, multiple lengths and more than 70 colors, according to a news release. Each fixture can be used independently or paired together to form a continuous run of acoustic illumination.

More information is available on the Luxxbox website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Rowan University, HPE Partner on New Learning Initiative

    Rowan University in Glassboro, N.J., recently announced that it has expanded its partnership with enterprise technology provider HPE to improve research capabilities and hands-on learning opportunities, according to a news release.