STEAM Center Construction at University of St. Thomas Underway

At the University of St. Thomas in St. Paul, Minn., construction is underway on a new centralized home for STEAM education. The Schoenecker Center will stand five stories and cover more than 130,000 square feet to integrate the school’s art, science, engineering and innovation programs, according to the university website. Design-build contractor McGough broke ground on the project in May, and construction is scheduled for completion during the spring semester of 2024.

The new facility will include amenities like a high bay for engineering, an emerging media newsroom and classrooms, science labs and offices, an art gallery, rehearsal and performance space for choral and instrumental groups, flex space for collaboration and group work, and a café with a community area.

The $110-million complex was named in honor of donors Guy and Barbara Schoenecker and aims to offer an inclusive approach to interdisciplinary education, according to a university news release. “This building is actually not about contradictions, but an ideal,” said Dean Don Weinkauf of the School of Engineering. “Forward-thinking students thrive at St. Thomas because they come with something more. They come with what I would call an ‘and’ spirit. Great at mathematics and athletics. Great at playing music and designing bridges.”

According to a November 2021 news story announcing the project, the building will house three distinct academic areas: Arts, Engineering and Sciences. It will also play home to the university Center for Artificial Intelligence, the Center for Data Science and the Center for Water Justice. It will also provide space to local K–12 schools and community groups for meetings and performances.

“What research is telling us, what our industry partners are telling us, is that they need graduates who have broad knowledge, who are flexible thinkers and who are used to working with different fields and different ideas,” said University President Julie Sullivan. “That’s exactly what you will see when you step through the doors of the Schoenecker Center.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California School District Starts Construction on Public Safety Center

    The San Bernardino City Unified School District (SBCUSD) recently announced that construction has begun on a new public safety center that will house the district’s safety and security programs. According to a news release, the James Ramos Center for Public Safety will measure in at 17,140 square feet and contain the district’s Police Department, Office of Emergency Management, and cadet program.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • Fellowes Launches New 3D Modular, Product Configurators

    Contract interiors and architectural solutions provider Fellowes recently announced the launch of new 3D modular and product configurators for several of its product lines, according to a news release. The new products offer SIF file integration and pricing for the Volo, Markerboards, Sena, and Rising product lines in connection with 3D Cloud, which provides 3D product visualization and 3D digital asset management.

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

Digital Edition