STEAM Center Construction at University of St. Thomas Underway

At the University of St. Thomas in St. Paul, Minn., construction is underway on a new centralized home for STEAM education. The Schoenecker Center will stand five stories and cover more than 130,000 square feet to integrate the school’s art, science, engineering and innovation programs, according to the university website. Design-build contractor McGough broke ground on the project in May, and construction is scheduled for completion during the spring semester of 2024.

The new facility will include amenities like a high bay for engineering, an emerging media newsroom and classrooms, science labs and offices, an art gallery, rehearsal and performance space for choral and instrumental groups, flex space for collaboration and group work, and a café with a community area.

The $110-million complex was named in honor of donors Guy and Barbara Schoenecker and aims to offer an inclusive approach to interdisciplinary education, according to a university news release. “This building is actually not about contradictions, but an ideal,” said Dean Don Weinkauf of the School of Engineering. “Forward-thinking students thrive at St. Thomas because they come with something more. They come with what I would call an ‘and’ spirit. Great at mathematics and athletics. Great at playing music and designing bridges.”

According to a November 2021 news story announcing the project, the building will house three distinct academic areas: Arts, Engineering and Sciences. It will also play home to the university Center for Artificial Intelligence, the Center for Data Science and the Center for Water Justice. It will also provide space to local K–12 schools and community groups for meetings and performances.

“What research is telling us, what our industry partners are telling us, is that they need graduates who have broad knowledge, who are flexible thinkers and who are used to working with different fields and different ideas,” said University President Julie Sullivan. “That’s exactly what you will see when you step through the doors of the Schoenecker Center.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Quadient Achieves 25,000 Locker Installations Worldwide

    Global automation platform Quadient recently announced that it has acquired Package Concierge, a U.S.-based parcel management solutions provider, according to a news release. The acquisition pushes Quadient over the 25,000-unit milestone of global installations.

  • Oregon Institute of Technology to Construct $35M Mass Timber Residence Hall

    Oregon Institute of Technology in Klamath Falls, Ore., recently announced the construction of a new, $35-million mass timber residence hall, according to college news. The facility will stand four stories, have room for 517 students, and cover 86,710 square feet to address the college’s need for more on-campus housing.

  • Zurn Elkay Announces Updated Line of Filtered Bottle Filling Stations

    Zurn Elkay Water Solutions recently released an updated line of its Elkay Filtered Bottle Filling Stations, according to a news release. The new line features a sleeker design and functional upgrades to help simplify filter maintenance and reduce long-term labor costs.