University of British Columbia Starts Construction on Gateway Building

The University of British Columbia in Vancouver, Canada, recently began construction on a new Gateway Building for the campus, according to local news. The $180-million mass timber building will stand six stories and cover about 267,000 square feet, and it will serve as the main point of entry to the campus as well as an academic building for a variety of subjects. Completion is scheduled for 2024, local news reports.

The university is partnering with architecture firm Perkins&Will for the building’s design. The firm’s website describes a central, daylit, six-story atrium featuring an interconnecting staircase and a variety of lounge spaces, as well as two five-story wings. The project’s sustainability goals include a minimum of LEED Gold and CAGBC Zero Carbon Building design certifications. The university also sought input from the indigenous Musqueam people, who own the land that the campus was built on.

“This was the first capital project where we did what we call ‘deep engagement’ with the Musqueam,” said Gerry McGeough, the university’s director of planning and design. “We went through a whole series of exploratory discussions with them where they defined what their values are they’d like to have embraced in this project.” The indigenous influence is most clearly seen in the building’s mass-timber interior.

Once complete, the new building will include research, teaching, and office space for the UBC Schools of Nursing and Kinesiology, the Faculty of Arts Language Sciences, UBC Health, and Integrated Health Services, according to the university website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Creating Long-Term Sustainability on College Campuses Through Fair Student Housing

    The quality of student housing can have a significant impact on an individual’s college experience. Today’s higher education institutions face mounting challenges, including declining enrollment, low retention rates between the first and second years, and a rise in student mental health concerns. Thoughtfully designed living spaces can help address these issues by creating environments that promote both academic focus and personal well-being.

Digital Edition