California Elementary School to Break Ground

The Folsom Cordova Unified School District in Folsom, Calif., is set to break ground on its newest elementary school, according to local news. The groundbreaking ceremony for Alder Creek Elementary School will take place at 5 p.m. local time on Tuesday, May 15, and the new facility is scheduled to open in time for the 2024–25 academic year.

The facility will stand two stories and cover 71,000 square feet, the Sacramento Bee reports. It will have the capacity for about 764 students in grades TK–5.

The district granted final approval for the project at a board meeting in late March, according to ABC10 News. The school’s construction is part of a wider master plan spanning 3,585 acres across the Folsom Ranch Development area. ABC10 News also reported separately that the community is planned to include three other elementary schools, one middle school, and a high school.

According to the Folsom Times, the district partnered with Rainforth Grau Architects for the project’s design. Plans for the site include a sports field, asphalt recreation and play areas, basketball courts, and room for later additions of portable buildings and a student care center. The contractors for the project have been named as Roebbelen Contracting and Lease Leaseback.

Funding for the project is coming from a combination of Measure M Bond state funds, general obligation bonds, and developer fees, the Folsom Times reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition