UC San Diego Starts Construction on 2,400-Bed Residential Complex

Local news reports that the University of California San Diego (UC San Diego) will soon break ground on the Ridge Walk North Living and Learning Neighborhood, a four-building complex that will provide additional academic and residential facilities. Amenities are set to include capacity for 2,400 new beds for undergraduate students; 19 new classrooms and a lecture hall with 150 seats; space for collaboration, studying, and academic support; and administrative space for the university’s Thurgood Marshall College, Department of Economics, and the School of Global Policy and Strategy.

The project is part of a larger university goal to add about 5,700 new beds to campus by 2025. The other two planned projects are the Theatre District Living and Learning Neighborhood, which would house 2,000 undergraduates; and the Pepper Canyon West Living and Learning Neighborhood, which would add 1,300 single-occupancy spaces for transfer students and upper-division undergraduates.

The university is also set to break ground on a new student union for its La Jolla campus. Combined, the Ridge Walk North Living and Learning Neighborhood and the student union will cost about $1 billion, according to local news. The new union, called Triton Center, will add resources like student health and academic services, a 500-person event space, and an alumni and welcome center.

Local news reports that the university’s student population is estimated to increase by 7,000 during the next ten years. Once the three new residential villages are complete, the university would have space for 24,000 students to live on campus.

According to the university website, Ridge Walk will include student amenities like student dining, a fitness center, an eSports facility, a glass lab, and more. The university partnered with HMC/EYRC for the facility’s design and general contractor Hansel Phelps for its construction. It has an estimated completion date of fall 2025 and is aiming for a LEED Certification Goal of gold.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

Digital Edition