Da-Lite Announces Upgrades to Modus VR Product Library

Da-Lite, a brand of AV technology company Legrand | AV, recently announced the addition of a new Tensioned Advantage electric screen and SightLine cable drop to its Modus VR visual experience product library. Da-Lite and Modus VR have scheduled a live demonstration or the visualization tool, the manufacturer’s first projection screen system on the platform, on Wednesday, Feb. 14, according to a news release.


Da-Lite’s Tensioned Advantage with SightLine now available in Modus VR visualization platform.
Image courtesy of Legrand | AV

“Two years ago, the SightLine cable drop feature redefined the projection screen category with its ability to add visual appeal and solve the most time-consuming obstacles in projection screen installations,” said Wendy Cox, Director of Product Management at Da-Lite. “Now you can see this eye-catching feature and speed up the buying decision process in a compelling way.”

SightLine offers the aesthetic of a floating screen through use of the Tensioned Advantage and Advantage electric screens. The news release reports that the suspension system features “three or four thin cables that can accommodate drop distances up to 70” (standard) and 10’ (optional) between the ceiling and the top of the screen.” The simplified design leaves room above the screen for cameras and speakers.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

Digital Edition