Da-Lite Announces Upgrades to Modus VR Product Library

Da-Lite, a brand of AV technology company Legrand | AV, recently announced the addition of a new Tensioned Advantage electric screen and SightLine cable drop to its Modus VR visual experience product library. Da-Lite and Modus VR have scheduled a live demonstration or the visualization tool, the manufacturer’s first projection screen system on the platform, on Wednesday, Feb. 14, according to a news release.


Da-Lite’s Tensioned Advantage with SightLine now available in Modus VR visualization platform.
Image courtesy of Legrand | AV

“Two years ago, the SightLine cable drop feature redefined the projection screen category with its ability to add visual appeal and solve the most time-consuming obstacles in projection screen installations,” said Wendy Cox, Director of Product Management at Da-Lite. “Now you can see this eye-catching feature and speed up the buying decision process in a compelling way.”

SightLine offers the aesthetic of a floating screen through use of the Tensioned Advantage and Advantage electric screens. The news release reports that the suspension system features “three or four thin cables that can accommodate drop distances up to 70” (standard) and 10’ (optional) between the ceiling and the top of the screen.” The simplified design leaves room above the screen for cameras and speakers.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.