Boston Community College Debuts Student Success Center

Bunker Hill Community College (BHCC) recently held a ribbon-cutting ceremony to celebrate the opening of a new Student Success Center on its campus in Boston, Mass., according to a news release. The 56,000-square-foot building is the college’s first new facility in more than ten years, and it plays home to the College Library & Learning commons, academic advising, coaching, and wraparound services to support students.

The university partnered with NBBJ as the project architect and the State’s Division of Capital Asset Management and Maintenance (DCAMM) and Bond Building and Construction for planning, engineering, and construction. The news release reports that all of the college’s buildings but one are about 50 years old and were designed to accommodate about 5,000 students. The campus has since tripled its student population and has seen an accumulation of deferred maintenance issues.

“Today, we are celebrating a new space that will benefit BHCC’s student community now and for years to come, improving their experience and maximizing the resources available to them,” said Massachusetts Secretary of Education Patrick Tutwiler. ”I want to share a strong congratulations to the BHCC leadership team and the entire student community for nurturing this project forward.”

The building was designed to be Net-Zero-Energy-ready, based on Passive House principles and including sustainability features like a geothermal well field on-campus, a future photovoltaic array, and a “highly insulated, high-performing envelope,” according to the news release.

“It is our genuine pleasure to deliver the space that your students deserve,” said DCAMM Commissioner Baacke. “Your students, faculty, and staff have been creating transformative experiences for 50 years, and they’ve been doing that despite the facilities. Now, they'll be doing it with the facilities that help make their jobs easier and not harder.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • T&T Construction Management Group Completes Pasco High School Expansion

    Pasco High School in Dade City, Fla., recently announced that it has completed an expansion project in partnership with T&T Construction Management Group, Inc., Harvard Jolly Architecture, and Williams Company.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

Digital Edition