Essential Springtime HVAC Upgrades for K–12 Schools

By Kirk Rizzolla

Spring is a wonderful time of year.  The days are longer, the weather begins to warm up, and everything is in bloom. However, for many people, this also means seasonal allergies will set in. The Centers for Disease Control and Prevention estimates that approximately 25% of adults and about 20% of children will suffer from seasonal allergies.

Environmental allergens can also be a major trigger for pediatric asthma, according to the National Institute of Health. In addition, school settings are a major source of significant allergen encounters.

For aging HVAC systems, these springtime changes can bring challenges for K–12 school facility managers when it comes to maintaining comfortable indoor air quality (IAQ) in classrooms. If units do not have adequate cooling capacity or proper filtration, this can lead to higher moisture levels that make the classrooms more susceptible to airborne irritants like mold, dust mites, and pet dander.

Children are especially susceptible to health problems linked to poor air quality. Studies show that reduced classroom air quality can cause a reduction in cognitive performance of pupils.

Having a solution in place that can provide the proper needs for classrooms can be the difference between a student succeeding or being distracted by an uncomfortable environment.


Image courtesy of Modine Manufacturing Company

Springtime Solutions to Improve IAQ

Mechanical HVAC systems have the ability to provide filtration and ventilation solutions to minimize the number of allergens in the air, as well as control the humidity level in a classroom.  For optimal IAQ, single-packaged vertical units (SPVUs) are a good option. They are more efficient at combatting allergens and maintaining proper humidity levels because they are controlled on a single-room basis as opposed to the whole facility.  

Another advantage that SPVUs have is temperature zone control.  Temperatures vary from room to room, so it’s important to have individual room control. With zone controls, facility managers can warm or cool the rooms used the most at the time they are being used. In addition, they can heat or cool only occupied areas leading to significant cost savings over time.

The Airedale Sentinel® Vertical Unit Ventilator by Modine is a good example of an SPVU that provides the proper amount of fresh air ventilation. This type of HVAC unit is often simpler and more cost-effective to install and maintain than rooftop systems, making them a practical choice for schools looking to upgrade their HVAC infrastructure. 

For smaller classrooms or where space is limited, installing units designed with a small footprint would provide the least disruption. The Airedale ClassMate® offers a smaller footprint, is designed with noise reduction and is easy to install.

Retrofitting to Combat Poor IAQ

As school budgets shrink and administrators still struggle with post-pandemic challenges, finding the funds to upgrade aging HVACs on a consistent basis may be difficult. 

By offering solutions that improve ventilation at a cheaper cost than a replacement, retrofitting is a more affordable alternative.  When compatible, adding air economizers can provide an efficient way to meet cooling demands and utilize less energy in the process. As the weather starts to warm up during spring, installing dehumidification controls would also be a good solution due to their ability to maintain comfortable relative humidity levels and provide improved IAQ.

Before considering any updates, school facility managers should make sure the HVAC unit can handle the additional components and added static. If the unit is too old or is not compatible, it can result in motors failing or less airflow, which can be problematic during warmer months.

Funding Options for Spring Upgrades

It’s no secret that at least half the schools in the U.S. alone are long overdue for substantial infrastructure upgrades. K–12 schools still have an opportunity to tackle some of their most pressing needs by tapping into an estimated $90 billion in unspent federal stimulus funding. The deadline for action is coming up sooner than later. Schools must request their funds by September 2024.

Kirk Rizzolla is the Sales Regional Manager for the IAQ division of Modine Manufacturing Company.

Featured

  • Oregon Institute of Technology to Construct $35M Mass Timber Residence Hall

    Oregon Institute of Technology in Klamath Falls, Ore., recently announced the construction of a new, $35-million mass timber residence hall, according to college news. The facility will stand four stories, have room for 517 students, and cover 86,710 square feet to address the college’s need for more on-campus housing.

  • diverse, simplified human figures in various colors seated around a curved table, with floating icons like light bulbs and speech bubbles above them

    Spaces4Learning Relaunches Advisory Board, Announces 12 Members

    Spaces4Learning is pleased to announce the relaunch of its advisory board and the introduction of its 12 distinguished members.

  • Michigan School District Installs New Gun-Detection Platform

    Williamston Community Schools in Williamston, Mich., recently announced that it has installed the ZeroEyes gun-detection video analytics platform for its five schools, according to a news release. ZeroEyes is the only solution of its kind with a U.S. Department of Homeland Security SAFETY Act Designation and adds an AI gun-detection and intelligent situational awareness software layer into existing school security cameras.

  • Quadient Achieves 25,000 Locker Installations Worldwide

    Global automation platform Quadient recently announced that it has acquired Package Concierge, a U.S.-based parcel management solutions provider, according to a news release. The acquisition pushes Quadient over the 25,000-unit milestone of global installations.