Prairie View A&M University Debuts New Academic Building

Prairie View A&M University in Prairie View, Texas, recently opened a new, three-story Engineering Classroom and Research Building (EnCARB), according to a news release. The 106,000-square-foot facility provides academic, research, and technical space for the university’s Roy G. Perry College of Engineering. The university partnered with integrated design and engineering firm Stantec for the project.

The new building features more than 30 labs for chemical, civil engineering, and mechanical departments, as well as multidisciplinary research in fields like space exploration, data analytics, robotics and artificial intelligence, 3D manufacturing, and more. It also includes built-in flexible spaces to support different pedagogies and a maker space.

“EnCARB will allow PVAMU to take their laboratory instruction and research pursuits to the next level with state-of-the-art facilities that are flexible by design and will allow them to be nimble and adapt in the fast-evolving field of engineering,” said Stantec principal Cynthia Labelle. “Students will learn and grow across many engineering disciplines in a future-focused learning environment.”

EnCARB will also be one of a small number of U.S. facilities to feature a microgravity drop tower for research regarding space-related conditions. Stantec has previously completed STEM-related facilities at universities like Yale, the University of Texas at Dallas, Central Michigan University, and the University of Texas at Permian Basin, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • CU-Lock Haven Receives $1.75M Gift for New Entrepreneurship, Media Center

    Commonwealth University-Lock Haven in Lock Haven, Penn., recently received a $1.75-million donation from entrepreneur and alumnus Nicholas Subich ’17, according to a university news release. The funds will go toward establishing the Nicholas Subich Center for Entrepreneurship and Media, a technology-driven hub for innovation and experiential learning.