D.C. Elementary School Achieves Double Platinum Certification

John Lewis Elementary School in Washington, D.C., recently became the first school in the award to be awarded both WELL and LEED certifications at the platinum level, according to a news release. As part of a three-step sustainability approach, the school is also aiming to become the first school in D.C. to achieve Net Zero Energy (NZE). The facility was designed by architecture and design firm Perkins Eastman DC.

The news release reports that the facility was designed to emphasize civic presence, community connectivity, the student experience, and student wellness.

“From the very beginning, the district wanted this project to establish a new benchmark for our ongoing investment in school facilities, with the aim of enhancing community sustainability and resilience—and fostering health and well-being among the students and teachers who use the building every day. Achieving ‘Double Platinum’ at John Lewis Elementary School celebrates the collaborative commitment involved in realizing this inspiring vision that will enable DC’s students and communities to thrive,” said Sean O’Donnell, FAIA, Perkins Eastman DC’s K12 Practice leader.

The WELL Platinum distinction came through the International WELL Building Institute’s (IWBI) WELL Building Standard. The LEED v4 Platinum distinction was awarded in March 2024 via the U.S. Green Buildings Council’s LEED for Building Design and Construction: School rating, according to the news release.

“DC Public Schools is dedicated to providing sustainable learning environments in which the district’s students can thrive,” said Shilpa Khatri, Deputy Chief of DCPS Facilities & School Planning. “In partnership with PEDC and DGS, we are excited that we were able to leverage John Lewis Elementary School’s unique site conditions and new construction opportunities to pilot a robust model of WELL certification, Net Zero design, and LEED certification. Our planning and design experience embodies ‘building as pedagogy,’ truly emphasizing the educational value in facilities and ensuring paths for long-term maintenance and durability,” said Khatri.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • Three U.S. Universities Install Acre Security Access Control Platform

    Cloud-native physical and digital security solutions company Acre Security recently announced that it has deployed its access control platform at three major universities in the U.S., according to a news release. Acre partnered with Atrium Campus to provide coverage for more than 69,000 students at the University of Virginia (UVA), George Mason University, and Rockhurst University.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition