Exhale Fans Launches New Generation of Bladeless Ceiling Fan

Exhale Fans recently announced the launch of Gen. 5 of its flagship HVAC delivery product, the world’s only bladeless ceiling fan, according to a news release. The fan provides users with a 10% savings on HVAC energy costs and requires no renovations to current systems to install. Features include a new motor construction, remote and wall switch, LED, and a new PCB.

Improvements in the Generation 5 model include increased material durability; a motor protection and audio warning system; a more efficient operating speed; color selection options for the built-in LED light; and a push-button remote.

“There is a very serious need for employing truly energy efficient technologies for structures of all types – residential, commercial, and public – especially regarding HVAC as we move closer to summer,” said Exhale Fans CEO Richard Halsall. “The opportunity to secure energy cost savings through Gen. 5 of our fan, all without having to reinvent the wheel in terms of structural design or equipment replacement, deems it a very important investment that has a great deal of long-term potential. Once Gen. 5 is installed, savings are immediately realized. This is proven by Purdue University’s Herrick Laboratory, not just my words.”

More information is available on the Exhale Fans website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.