Case Systems Launches Line of K–12 Learning Spaces Installations

Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

The line includes mobile storage cabinets, 3D printer carts, maker tables, and wall-mount panel systems. Unique design features include recessed pegboards and side panels for storage that are also dash-patterned to offer compatibility with a variety of hooks. Movable furniture features sinusoidal split wheels to allow easy moving across carpet and concrete. Finally, the integration of fixed and mobile storage integration creates a transformable but clutter-free learning environment.

"Our goal is to create a space that transitions effortlessly to meet the needs of every student and teacher. SALTO makes that vision a reality,” said Kelly Wehner, Case Systems President. “SALTO is an education-first brand that flips the script on traditional classrooms, delivering multi-purpose furniture and storage solutions that put the fun in functional. We designed SALTO based on the real needs of teachers and students, creating classrooms that support more learning, fewer limits, and better experiences for everyone.”

According to the news release, key benefits of the product line include easy adaptability for project-based learning, providing the potential for on-the-fly layout changes, and increased creativity in maker spaces by keeping all tools and materials within close reach.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Uvalde Schools Receive AI Security Technology through Grant Program

    AI-powered gun detection and emergency response technology solutions provider Omnilert recently launched the Save Haven Grant program, according to a news release. The first recipient of the grant, aimed specifically at schools that have faced gun violence, will be the Uvalde Consolidated Independent School District (Uvalde CISD) in Uvalde, Texas.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

Digital Edition