New Jersey High School Debuts Auditorium Renovation, Technical Upgrades

Plainfield High School in Plainfield, N.J., recently completed a series of construction projects including an auditorium renovation, a new eSports gaming arena, and a black-box theater, according to a news release. The school partnered with PureTek Group to install the Pliant Technologies CrewCom professional wireless intercom system, providing full coverage and clear communication across all new spaces.

The auditorium and black box theater are on one side of the building and the eSports arena made up of two adjacent classrooms on the other. The intercom system’s coverage capabilities have provided major benefits in practice, according to the news release.

Plainfield High School Auditorium
Photo courtesy of Pliant Technologies

“The eSports arena has only enough space for gamers and coaches, so for tournaments, the auditorium serves as a viewing area for audiences,” said PureTek Group Co-Founder and President Dan Litvin. “To achieve a collaborative performance, communication is key, so reliable coverage from a distance is a necessity. With Pliant, production personnel at the school are able to communicate clearly from the eSports arena all the way to the backstage booth in the auditorium.”

The intercom system uses “one CrewCom 2+2 Control Unit (CCU), three CrewCom 900MHz Radio Transceivers (RTs), seven CrewCom 900MHz 2-Volume/2-Conference Radio Packs with seven SmartBoom PRO single-ear headsets,” and accessories like a drop-in radio pack, battery charger, and supply cords.

Plainfield High School Backstage Auditorium Booth
Photo courtesy of Pliant Technologies

The system’s ability to use multiple channels has also worked in the school’s favor. Booth operators, auditorium operators, the backstage area, and eSports broadcasting personnel can all communicate among each other on separate feeds to have single conversations, the news release reports.

“We now have cutting-edge technology, and we’re very excited that our students have the opportunity to be very hands-on in terms of learning the equipment,” said Jean Gordon, Plainfield Public Schools’ Chief of Instruction and Programs. “We are now offering our students a new skillset that they can take out into the world.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition