Zurn Elkay Announces Updated Line of Filtered Bottle Filling Stations

Zurn Elkay Water Solutions recently released an updated line of its Elkay Filtered Bottle Filling Stations, according to a news release. The new line features a sleeker design and functional upgrades to help simplify filter maintenance and reduce long-term labor costs. The ezH2O Bottle Fillers, which debuted in 2010, were designed to reduce lead, PFOA/PFOS, and other contaminants.

The units were designed for public spaces like schools, universities, office spaces, gyms, and more. The updated line features the new colors Midnight Black, Arctic White, and Standard Gray. “With the 51600C High-Capacity Replacement Filter, the filter life is doubled to 6,000 gallons and is certified to NSF/ANSI 42, 53 and 401 for the reduction of lead, microplastics, cysts, Class 1 particulate and chlorine taste and odor. Elkay’s WaterSentry 71300C is also rated for the reduction of PFOA/PFOS, two prevalent PFAS chemicals, commonly known as ‘forever chemicals’ for the highest-performing filtration option,” according to the news release.

Other features include a drop-down wrapper, LED filter status display, and an automatic filter light reset. Clients can track data like the number of bottles saved, water usage, and filter status, as well as schedule flushing events to keep plumbing lines clean.

More information is available on the Zurn Elkay website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • TCU Marks Campus Expansion Milestone

    Texas Christian University in Fort Worth, Texas, recently held a topping-out ceremony to mark progress on a major campus expansion effort including four new residential facilities and a five-story parking garage, according to a news release.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.