Boise State University Starts Construction on New Academic Building

Boise State University in Boise, Idaho, recently broke ground on the new ESI Construction Management Building, according to university news. The university is partnering with Engineered Structures, Inc., for the building’s construction. It will play home to the university’s construction management program and include amenities like classrooms, offices, meeting rooms, and lab space.

University news reports that student enrollment in the program has increased by 80% over the last six years. The university partners with local contractors to provide internship opportunities to students, and the program has a post-graduation job-placement rate of 100%.

“When we talk about construction management, what we’re talking about is building. That’s what Boise State does. It builds stronger, more creative, more resilient and smarter people. It builds a stronger, more resilient and more creative Idaho,” said Boise State University President Dr. Marlene Tromp. “As we look forward to the future of this great state, we have so much to owe to all of you who have had a hand in taking the character of this program and using it to advance this state, to grow the impact of Boise State University, and to change our future for the better.”

The building will be equipped with the latest construction technology and include features like a student collaboration area, a computer lab of 40 seats, classrooms, conference and competition team rooms, a high bay featuring an overhead crane, and dedicated outdoor learning space.

The university also partnered with Lombard/Conrad Architects for the building’s construction, according to the university website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Florida District Completes Construction on New Leadership Institute

    Pinellas County Schools near Tampa, Fla., recently announced that construction is complete on the new Dr. Michael A. Grego Leadership Institute, according to a news release. The district partnered with Rowe Architects for the project’s design and with Skanska for construction services.

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.

  • Academy of Classical Education Breaks Ground in Louisiana

    Charter Schools USA (CSUSA) recently announced the groundbreaking of a new public charter school in Covington, La., according to a news release. The Academy of Classical Education at Covington will enroll students in grades K–8 and is scheduled for completion in August 2026, just in time for the new school year.