Boise State University Starts Construction on New Academic Building

Boise State University in Boise, Idaho, recently broke ground on the new ESI Construction Management Building, according to university news. The university is partnering with Engineered Structures, Inc., for the building’s construction. It will play home to the university’s construction management program and include amenities like classrooms, offices, meeting rooms, and lab space.

University news reports that student enrollment in the program has increased by 80% over the last six years. The university partners with local contractors to provide internship opportunities to students, and the program has a post-graduation job-placement rate of 100%.

“When we talk about construction management, what we’re talking about is building. That’s what Boise State does. It builds stronger, more creative, more resilient and smarter people. It builds a stronger, more resilient and more creative Idaho,” said Boise State University President Dr. Marlene Tromp. “As we look forward to the future of this great state, we have so much to owe to all of you who have had a hand in taking the character of this program and using it to advance this state, to grow the impact of Boise State University, and to change our future for the better.”

The building will be equipped with the latest construction technology and include features like a student collaboration area, a computer lab of 40 seats, classrooms, conference and competition team rooms, a high bay featuring an overhead crane, and dedicated outdoor learning space.

The university also partnered with Lombard/Conrad Architects for the building’s construction, according to the university website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition