ProTeam Launches GoFit 6 HEPA Backpack Vacuum

Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Product amenities include HEPA filtration; multiple applications including remediation and lead-safe abatement, as well as use in hospitals, clinics, and patient-care settings; alignment with the EPA’s definition of a HEPA vacuum according to the Lead Safety Renovation, Repair, and Painting Rule; and a unique method of suction that avoids agitating dust, the news release reports.

“The new GoFit 6 HEPA is an evolution from our LineVacer,” said ProTeam Vice President and General Manager Matt Reimers. “Launching this unit is the latest in expanding our GoFit product lineup which features corded and cordless models. All these vacuums, including the new HEPA unit, are designed to make efficient use of our customers time while feeling comfortable to wear.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • Colorado State University Global, SCTE Launch Online Certificate Program

    Colorado State University Global (CSU Global), based in Denver, Colo., recently announced a partnership with CableLabs subsidiary the Society of Cable Telecommunications Engineers (SCTE) to launch an online certificate training program for broadband professionals, according to a news release.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

Digital Edition