California District Starts Construction on New Robotics Facility

The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration. The district partnered with Quattrocchi Kwok Architects (QKA) for the project’s design and Landmark Construction for construction, with Blach Construction as construction manager.

The new building will replace portable buildings and makeshift classrooms around the district, providing amenities like field space; spectator seating; and workshop, classroom, and teamwork areas, the news release reports. In terms of designing to the space’s function, extra consideration was given to the building’s mechanical and electrical infrastructure, technology, controlled daylighting, acoustic roof deck, wall panels, and security systems.

“We are thrilled to create a dedicated space for our award-winning Robotics Teams, who consistently demonstrate exceptional creativity and skill,” said FUHSD Superintendent Graham Clark. “This new facility will ignite our Robotics Programs, fostering greater collaboration and further innovation. We want to thank the community and our project team for supporting this vision.”

Other design aspects include high ceilings for work and experimentation with aerial drones, as well as Electrostatic Discharge (ESD)-protected floors to prevent the buildup of static electricity between electronics and robots. The facility’s Wi-Fi infrastructure was also set up to avoid interference with robotic control systems, according to the news release. Exterior features include rooftop solar panels, an entry plaza, and outdoor workspaces.

“Designing a facility with such unique requirements presented its own challenges, but the collaboration with current and recent students, adult mentors and coaches was invaluable to our design process,” said QKA Principal Nick Stephenson. “Their firsthand insights directly shaped the project’s outcome, helping us create a facility that will greatly benefit and enhance their program.”

The building is scheduled to open to students at the beginning of the fall 2026 semester, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • Epson Receives Seven AV Industry Awards

    Projectors manufacturer Epson recently announced that it received multiple awards across the Higher Ed AV Awards, SCN Stellar Service Awards, and InfoComm 2025, according to a news release. The company was recognized for three projectors from its PowerLite L-Series line, accessories, installation process, and its customer support team.

  • Creating Long-Term Sustainability on College Campuses Through Fair Student Housing

    The quality of student housing can have a significant impact on an individual’s college experience. Today’s higher education institutions face mounting challenges, including declining enrollment, low retention rates between the first and second years, and a rise in student mental health concerns. Thoughtfully designed living spaces can help address these issues by creating environments that promote both academic focus and personal well-being.

  • Longwood University Selects Builder for $73M Performing Arts Center

    Longwood University in Farmville, Va., recently announced that it has selected Swedish construction company Skanska as the builder of its new performing arts center, according to online news. The project involves the demolition of the current building and constructing a new, 64,500-square-foot facility.

Digital Edition