AP Construction Breaks Ground on Two Projects for Austin ISD

Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027. The district also partnered with PBK Architects for design work on both schools.

McCallum High School will be expanded to include a new space for the Science and CTE department, a three-story building measuring 54,000 square feet. The space will include space for robotics, wood shop, biology, chemistry, physics, and computer labs. The school’s existing science wing will be demolished. Work also includes a new, secure vestibule and remodeling the front office.

“AP recognizes the incredible responsibility and honor of creating spaces where students can learn and flourish by delivering quality renovations that enhance the educational environment,” said AP Senior Director of Preconstruction Tommy Meserole. “Schools are the heart of the community, fostering growth and connection and we are dedicated to providing exceptional work to support these campuses.”

Meanwhile, Anderson High School will see a new 43,350-square-foot competition gym with the capacity for 1,800 spectators, locker rooms and coaches’ offices, training rooms, laundry, and officials’ dressing rooms. The school’s front office and entry vestibule will also be reconfigured for security, according to the news release.

“The new athletic facilities are more than just a place to play; they’re vital for developing teamwork, discipline and physical well-being,” said Brian Lancaster, Anderson High School Principal. “They provide a platform for students to build character, learn important life skills and foster a sense of community and school pride.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

Digital Edition