Zurn Releases New Ductile Iron Frame Trench Drain System

Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.

The lightweight, durable iron frame adds DIN F loading capacity and incorporates a center bolt lockdown to meet DIN F load requirements, as well. The 6” system includes the standard, radiused bottom of the Z886 Perma-Trench Drain channels, which reduces the buildup of sediment and increases rate of flow. Zurn also offers trench channels with black additives for UV protection.

“This new system leverages the benefits of Zurn’s market leading 6” trench channel system,” said Nick Heschke, Siteworks Product Manager at Zurn Elkay. “We’ve expanded on our standard trench drain systems to provide even more durability and strength. We’re helping our customers to reduce the installation time required for DIN F drain trench systems that typically are difficult to transport and install with current market solutions.”

According to the news release, the new system has lightweight modular sections that cut down installation time by up to 75% compared to polymer concrete frames. Rebar clips allow for easy attachments to rebar, as well as height adjustments. The longer, lightweight lengths have fewer joints and are durable enough for easy handling.

More information is available on the Zurn website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.