Embry-Riddle Breaks Ground on New Office Building

Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced that construction has begun on a new office building for its campus Research Park, according to a news release. The university partnered with Hoar Construction on the 34,740-square-foot Center for Aerospace Technology II (CAT II), which will be used for research and lab purposes.

The John Mica Engineering and Aerospace Innovation Complex (also known as the MicaPlex) contains multiple research and development facilities in fields like aviation, engineering, business, space, security & intelligence, and technology. The university is partnering with architecture firm ikon.5 architects on CAT II, which will contain office and research lab space, the news release reports.

“Hoar is pleased to once again partner with ERAU on a project that supports the university’s mission to drive innovation in aerospace and engineering,” said Hoar Construction’s Michael Parks, senior vice president of the Florida division. “CAT II is designed with cutting-edge research and collaboration in mind, and we’re excited to bring that vision to life with a facility that reflects the caliber of work happening here. Our Florida team has an extensive repertoire of both higher-ed and office initiatives, and we look forward to working alongside our partners to deliver this project on time to the highest standards of quality.”

Embry-Riddle and Hoar have previously partnered on an almost-240,000-square-foot, four story parking garage including more than 8,000 square feet of office space on the first floor, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

  • Uvalde Schools Receive AI Security Technology through Grant Program

    AI-powered gun detection and emergency response technology solutions provider Omnilert recently launched the Save Haven Grant program, according to a news release. The first recipient of the grant, aimed specifically at schools that have faced gun violence, will be the Uvalde Consolidated Independent School District (Uvalde CISD) in Uvalde, Texas.

  • Tufts University Breaks Ground on Two New Residence Halls

    Tufts University in Medford, Mass., recently broke ground on two new residence halls with a total capacity of 664 beds, according to local news. The project’s ultimate goal is to expand on-campus housing and reduce pressure on the local housing market.

Digital Edition