Tennessee State University Gains Approval for New Engineering Facility

Tennessee State University in Nashville, Tenn., recently announced that it has received approval from the Tennessee State Building Commission to build a new engineering building on campus, according to a university news release. The 70,000-square-foot, $50-million facility will play home to the university’s engineering programs and the Applied & Industrial Technology program, providing a consolidated complex for innovation, research, and collaboration. Construction will begin later this year and has an estimated completion date of summer 2027.

“Over the years, our college has experienced significant growth in students, faculty, research, and academic programs,” said Dr. Lin Li, Dean of the College of Engineering. “This facility will provide a world-class space that enhances interdisciplinary collaboration across six undergraduate programs, three master’s programs, and one Ph.D. program. It will also host innovative engineering activities that directly benefit the metro Nashville area and Middle Tennessee.”

The facility features classrooms; computer labs; and a combined total of 30 teaching and research labs, including a Future Energy Lab, Drone Flight and Air Traffic Lab, and an Additive Manufacturing Lab, the news release reports. The university partnered with Melvin Gill & Associates and Bauer Askew Architecture for the project’s design.

“The new engineering building is the first step in elevating Tennessee State University’s engineering program to meet the demands of industry and the state of Tennessee,” said Will Radford, the university’s assistant vice president of Planning, Design, and Construction. “By establishing new partnerships and providing modern facilities, we are positioning TSU engineering students to not only keep pace but to set standards in the industry.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Fellowes Launches New 3D Modular, Product Configurators

    Contract interiors and architectural solutions provider Fellowes recently announced the launch of new 3D modular and product configurators for several of its product lines, according to a news release. The new products offer SIF file integration and pricing for the Volo, Markerboards, Sena, and Rising product lines in connection with 3D Cloud, which provides 3D product visualization and 3D digital asset management.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • Average Annual Number of Tornadoes per State

    New Tornado Wind Load Design Criteria in IBC Offer Improvements to Life Safety

    For the first time in U.S. building code history, the 2024 International Building Code (IBC) includes tornado wind load design criteria, marking a significant advancement in life-safety provisions.