Construction Begins on East Austin CTE-Focused High School

The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students. The district partnered with Pfluger Architects and American Constructors on the facility, which is scheduled for completion in August 2027.

The campus will consist of a main academic building, field house, concession venue, and baseball and softball facilities, the news release reports. It will include outdoor learning environments, hands-on learning spaces, and an aesthetic façade to welcome visitors. Sustainability features are set to include a geothermal energy system and a water collection and reuse system for irrigation.

“Central to the whole design is the Learning Courtyard that creates both visual and physical connections—encouraging interaction and supporting a sense of belonging across campus,” said Pfluger Architects Senior Project Manager Heather Rule. “The design was inspired by vibrant city centers where people naturally gather, connect, and learn from one another. This vision aligns with the diverse Del Valle community and reflects a desire to create a welcoming environment where different cultures, experiences, and voices are celebrated equitably.”

Funding for the project comes from the district’s 2022 bond, and its ultimate purpose was to address overcrowding at the existing Del Valle High School campus.

“Equity was a driving factor in the campus design, ensuring the new school offers the same learning opportunities as the existing high school,” said Christian Owens, Pfluger Architects’ Principal Design Director. “The new Del Valle high school facility brings vibrancy to the community, offering diverse educational spaces, and serving as a cornerstone by providing opportunities and experiences for future students.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • Empowering People Through Smart, Sustainable Campuses

    Sustainability is facing increasing scrutiny, with some questioning its costs and priorities. Yet for universities, it remains an essential driver of resilience, operational efficiency and long-term competitiveness. At the same time, there is a growing recognition that sustainable transformation is not just about reducing energy consumption and emissions to comply with tightening regulations ‒ it’s about creating vibrant, comfortable environments where people can thrive, innovate and connect. For university leadership, this is a complex balancing act, with rising energy costs and limited budgets only adding to the challenge.

Digital Edition