El Paso District Breaks Ground on New Elementary School

The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027. The $73.9-million facility is part of a larger, $387-million initiative to update learning spaces for students.

The building will play home to K–5 students and will include 36 classrooms, collaborative learning spaces, a gym, cafeteria, library, and outdoor learning and play spaces. The school’s central corridor will provide views of the area’s mountain ranges, as will angled windows scattered throughout the rest of the school. Built into the natural slope of the terrain, the new school will create “a seamless relationship between indoor and outdoor spaces,” according to the news release.

“The school acts as a bridge between the Westway neighborhood and the new southern developments, inviting students to look toward their future while remaining grounded in community,” said Pfluger Architects’ Christian Owens, Principal Design Director. “El Mirador is a symbol of community connection and pride, where the design merges storytelling, biophilic elements, and cultural identity to create an environment that celebrates both place and possibility.”

Aesthetic features include a color palette that draws from the area’s native plant life and desert terrain with warm, natural tones.  The building’s finishes are “resilient, low-maintenance, and timeless, ensuring longevity and flexibility while supporting comfort and sustainability,” the news release stated.

“The new Deanna Davenport Elementary will give our students and teachers the tools and spaces they need to continue excelling,” said Principal Guadalupe Montañez. “This facility will support academic excellence, promote creativity and curiosity, and strengthen our sense of community.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition