LACCD Holds Groundbreaking for $40M Student Services Building

The Los Angeles Community College District (LACCD) held a groundbreaking ceremony last week for the new $40-million student services building at Los Angeles Mission College. The event, which was livestreamed on YouTube and Facebook on Thursday, April 15, was the first in-person event for LACCD since the beginning of the coronavirus pandemic.

Attendees included members of the LACCD Board of Trustees, the Chancellor, the Los Angeles Mission College community, and other district officials. Featured speakers included LACCD Board President Steven F. Veres, LACCD Chancellor Francisco C. Rodriguez, Ph.D., and Mission College President Monte E. Perez.

The new Student Services & Administration Building will consist of three stories and cover 59,000 square feet. It will house student services like admissions, financial aid, and other administrative offices. The building was designed and placed to serve as a gateway to the campus, both physically and metaphorically. It will follow LEED Gold technology standards and include sustainability efforts like drought-tolerant landscaping, green-roof technology to minimize use of HVAC systems, and 66 kWh of solar panels.

Los Angeles Mission College is one of nine schools included in the LACCD system. The construction is part of the district’s “BuildLACCD” initiative, a $9.6 billion capital improvement plan that has seen more than 700 projects completed to date. The Student Services & Administration Building is also the first project of the initiative to be funded entirely from the $3.3 billion in “Measure CC” bond funds that voters approved in 2016.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition