Facilities (Sports and Fitness)
- By Andrew LaRowe, Mike Raible
- 10/01/19
Case Histories (Real-World Solutions)
Facility Focus (Student Centers)
Facilities (Workforce Development)
- By Pam Loeffelman
- 10/01/19
Facility Focus (Student Centers)
Ask the Expert (Restroom Fixtures)
- By Klaus Reichardt
- 10/01/19
Emerging Technology (Enhancing, Engaging, Connecting)
Innovative AV technologies are changing the higher ed experience.
Facilities (Campus Spaces)
Building envelope systems not only work to keep the inside in and the outside out, but can also contribute to a facility’s or institution’s sustainability goals while presenting an attractive, functional front.
Makerspaces are providing students with the tools they will need in the world of work through hands-on projects and the use of cutting-edge technology.
Facilities (Building Envelope)
New School Construction
The two-story, $51 million school was designed by DLR Group and constructed by AMG & Associates. When completed in August 2020, it’s expected to accommodate up to 900 students in transitional kindergarten through sixth grade.
- By Yvonne Marquez
- 09/30/19
Infrastructure Solutions
Through ABM’s Energy Performance Contracting program, the customized solution is projected to save the school district close to $5 million in energy and operating costs over a 15-year period.
- By Yvonne Marquez
- 09/30/19
School Transportation
Montgomery Public Schools in Alabama recently installed Verizon Connect, a GPS fleet tracking software, that has significantly reduced school bus idling times by almost 80 percent.
- By Yvonne Marquez
- 09/25/19