Water Conserving Urinal

water-conserving urinal 

On average, a water-conserving urinal conserves 40,000 gallons of water per urinal, per year. With this savings in water you can enhance your students’ restroom experience with Betco air care and skin care.

School districts across the U.S. are looking for ways to save money. Drought conditions and water bans in Central Texas led Pflugerville ISD to install Betco’s Smart Restroom System, a water conserving urinal system. This innovative system is on track to save in excess of 10 million gallons of water per year, and provides a comprehensive solution to building owners, managers and facility management to reduce operating cost, meet the growing trend in environmental responsibility for LEED and BOMA 360 certified properties and exceed the ever increasing expectations of tenant and building occupant’s for environmental responsibility, building cleanliness and personal hygiene.

Betco Smart Restroom System uniquely meets these needs through the provision of program and product systems that reduce operating costs through reduced water consumption and energy to heat water, assists in LEED and BOMA 360 certification by providing the opportunity to gain points from reduced water consumption and energy to heat water, plus the use of environmentally responsible cleaning and maintenance products, and improves student satisfaction with clean, hygienic and pleasant restrooms.

District Executive Director Bill Clayton says, “Most waterless urinals were expensive and burdensome to maintain. They required totally replacing the existing urinal, which usually was at least as expensive as the one being replaced. This typically would cause the restroom wall and/or floor to need repair after the old urinal was removed and before the new one was installed. The Betco SmartValve was presented to us for consideration. The installation was simple, it used the existing valve body and urinal so there was no facility renovation required.”

www.betco.com

This article originally appeared in the School Planning & Management August 2013 issue of Spaces4Learning.

Featured

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • College of the Mainland Starts Construction on New Library & Learning Center

    College of the Mainland in Texas City, Texas, recently held a groundbreaking ceremony for its new Library & Learning Center, according to a news release. The new facility is part of a larger, $250-million campus expansion project funded by a 2023 bond program.

Digital Edition