Forward vs. Reverse Auctions

In a nutshell, there are really only two categories of auctions — forward and reverse auctions. There may be variations with these based on a number of factors, including the progress of the auction and the criteria for determining the “winner” of the auction.

Forward auctions take the form of a single seller offering an item for sale, with buyers competing to secure the item by bidding the price upward. Forward auctions are far-better understood by the public at large than reverse auctions as to how they operate, due primarily to the fact that they are widely used at the consumer level. They are also widely used when the goal is for the seller to receive the most money possible for the item being offered at auction. Thus, a forward auction should be utilized for sales of goods and services of all types, whether conducted online, offline or a hybrid of the two.

Reverse auctions are the other major form of auctions. In a reverse auction, a single buyer makes potential sellers aware of their intent to buy a specified good or service. During the course of the actual reverse auction event, the sellers bid against one another to secure the buyer’s business, driving the price to be paid for the item downward. Thus, the winning bidder is the seller who offers the lowest price. Reverse auctions are most typically used for procurement by private companies, public sector agencies and nonprofit organizations.

Reverse auctions are not a short-term tactic for procurement operations, but are, in fact, a proven method for long-term management of indirect spend — delivering significant savings and process efficiency. For more information on reverse auctions and the procurement process, visit Reverse Auction Research online at www.reverseauctionresearch.org.

Source: Reverse Auction Research (www.reverseauctionresearch.org)

This article originally appeared in the College Planning & Management September 2013 issue of Spaces4Learning.

Featured

  • Greenheck Launches New Series of Rooftop Units

    Air movement, control, and conditioning solutions provider Greenheck recently launched a new line of rooftop units that merge the conveniences of traditional rooftop ventilators and dedicated outdoor air systems, according to a news release. The Model RT controls temperature and humidity for indoor comfort.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

  • Tennessee District Opens New Central Office

    The Franklin Special District (FSD) in Franklin, Tenn., recently held a ribbon-cutting ceremony for its new 38,400-square-foot Central Office facility, according to a news release. The district partnered with Wold Architects and Engineers to create an administrative space designed to boost productivity, collaboration, and employee wellness.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

Digital Edition