Setting the Bar High for Green Energy

Green Energy

The Poudre Valley School district is seeing long-term drops in energy usage and costs as a result of installing ClimateMaster pumps and units in their new buildings.

For almost two decades, the Poudre Valley School District (PSD) in Ft. Collins, Colo. has been a vanguard of energy conservation and management initiatives on a national level. In an era of ever-shrinking budgets, fewer dollars expended on energy means more of the district’s funds can go toward actual education. For PSD, it isn’t just about being green: reducing energy costs is essential to protecting the educational mission of the schools.

In the late 1990s, PSD began exploring energy- and cost-efficient designs for new construction to be funded by a school district bond. A team of PSD planning, design and construction staff chose the new facilities and operations building to launch cutting-edge, energy-efficient technology it planned to include in subsequent construction projects throughout the district.

Inside the new building, nine ClimateMaster Genesis Packaged (GS) vertical units supplying 18 tons of total capacity were installed above the ceiling between the first and second levels to heat and cool each of the building’s nine zones.

According to PSD Energy Manager Stu Reeve, who has spent almost 25 years analyzing geothermal technology and has visited various manufacturers’ facilities, “ClimateMaster units are excellently designed and built with maintenance personnel in mind.”

The energy performance of the Climate-Master pumps in the new building has been nothing short of stellar. Initially earning an ENERGY STAR rating of 97 out of 100 in 2003, it received a rating of 100 in 2005, and a 99 rating for each of the last 6 years. According to Reeve, the 99 rating is 15 points higher than the average for all Colorado ENERGY STAR buildings and plants.

For the Poudre Valley School District, the real success story of the operations building lies in the long-term savings in energy use, and thereby costs. “The ClimateMaster ground source heap pump HVAC system at our operations building has become the benchmark high-efficiency standard for both comfort and energy performance at PSD, and in the state of Colorado,” Reeve concludes.

www.climatemaster.com

This article originally appeared in the School Planning & Management December 2013 issue of Spaces4Learning.

Featured

  • Kimball International Announces New, Updated Products

    Furnishings manufacturer Kimball International recently announced a series of new and enhanced products for use in education, office, and healthcare spaces, according to a news release.

  • Abstract colorful arrows in front of a contemporary university building

    Spaces4Learning 2025 Trends in Higher Education

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in higher education from the experts in the trenches.

  • Boise State University Starts Construction on New Academic Building

    Boise State University in Boise, Idaho, recently broke ground on the new ESI Construction Management Building, according to university news. The university is partnering with Engineered Structures, Inc., for the building’s construction.

  • Exhale Fans Launches New Generation of Bladeless Ceiling Fan

    Exhale Fans recently announced the launch of Gen. 5 of its flagship HVAC delivery product, the world’s only bladeless ceiling fan, according to a news release. The fan provides users with a 10% savings on HVAC energy costs and requires no renovations to current systems to install.