The Impossible Made Possible

Sponsored content by VICTOR STANLEY, INC.

Since the introduction of our model NRBI-225 and NRBO-225 curved benches, we have been receiving frequent requests asking for custom continuous seating in varying configurations, lengths and mixed radii. Having perfected meeting these design requirements with our backless FRB benches, we set out to solve the complicated engineering, tooling and design challenges for producing custom radii NRB style continuous seating with backs. We are very proud to announce that we made what we thought was impossible, possible.

Comfort was a big challenge in producing these benches, given the compound angles and the need to keep the seat pitched using our traditional contour, rather than the easier, less comfortable and far less elegant seating which some offer using horizontal seats with no pitch. The pitched seat and back required breakthrough innovations in fixture and tooling design coupled with computer communications between machines, resulting in great flexibility and enormous value.

Imagine the complexity of positioning an array of formed steel ribbons in an everadjustable sweep of radii, while maintaining the pitch and comfort of a contoured seating surface. Now imagine incorporating sufficient precision to hold, maintain and weld dozens of such pieces. We can now do benches in fixed radii, concentric radii, even the classic moving elegance of the French curve. And, because of the investment in tooling and technology, we can do all this cost-effectively, flexibly and quickly. It’s just another way Victor Stanley helps you create the perfect setting for timeless moments.

This article originally appeared in the issue of .

Featured

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • South Carolina District Starts Construction on $50M Middle School Renovation

    The Aiken County Public School District in North Augusta, S.C., recently held a groundbreaking ceremony for the $50-million renovation and expansion of North Augusta Middle School, according to a news release. The project’s funding comes from the 2024 renewal of a one-cent sales tax approved by local voters.