Never Get Called on the Carpet

Sponsored content by L & M CONSTRUCTION CHEMICALS

At least thousands maybe hundreds of thousands. That’s what you’ll save with an FGS/PermaShine polished concrete floor. The explanation is really pretty simple. FGS/PermaShine floors don’t scuff, scratch, peel, chip, mark or any of the other things that mess up any other kind of floor.

Why? Because unlike other floors, FGS/PermaShine floors aren’t just thin coatings or wax. The beauty of PermaShine is built right into the concrete so it never wears off and it never wears out. That means you’re saving money from day one.

Keeping your floor looking new is simply elementary. FGS/PermaShine polished concrete floors don’t really need a lot of care. Sweep them, wash them, use them. That’s it. Really. Nothing to replace, no stripping and no high maintenance costs. Ever.

Old school. New school. This just might be the best part. The FGS/PermaShine system works just as well on an old floor as it does a new one. We’ve restored floors that were over 100 years old. Compare FGS/PermaShine restoration to replacement costs and you’re in for a very nice surprise.

FGS/PermaShine floors are GreenSpec certified and contribute to LEED points for their sustainability and environmental advantages? (Ask about our FREE Guide to Polished Concrete and LEED.)

Slip into something more comfortable. Not on the floor. FGS/PermaShine floors aren’t slippery, despite their shiny appearance. In fact, The National Floor Safety Institute (NFSI) certified FGS/PermaShine as “High Traction” floors. That means that your new floor will maintain the same non-slip characteristics as bare concrete.

How do you graduate to a PermaShine floor? That’s easy — and less expensive than other floor options. Give us a call or check us out at www.FGS-PermaShine.com.

This article originally appeared in the issue of .

Featured

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • KWK Architects Announces Full Transition to Lawrence Group Branding

    KWK Architects recently announced that it will complete its transition to the Lawrence Group brand effective July 1, according to a news release. The merger marks the end of a three-year strategic integration process that began in March 2023 to unite the firms.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • Hawaii Elementary School Reopens Following $25M Campus Modernization

    Haʻaheo Elementary School in Hilo, Hawaii, has reopened to students following a three-year, $25-million campus modernization and expansion project that significantly increases the school's instructional space while preserving one of the island's oldest educational institutions, according to local news.